EasyManua.ls Logo

Seakeeper Ride - Port Controller Zeroing

Seakeeper Ride
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Controller Zeroing will have a second section located on the second page of the Service Item Menu
for the Starboard Controller.
Plug in the Starboard Actuator so that both Actuator Cables are plugged into the Distribution
Module.
Note: Repeat the steps above to congure the Starboard Controller.
6/21/24, 9:02 AM
Seakeeper Ride | Commissioning Instructions – Seakeeper Manuals
https://manuals.seakeeper.com/ride/seakeeper-ride-commissioning-instructions/?print=true
20/41

Related product manuals