EasyManua.ls Logo

Seamax Inflatable Boat - BEFORE ASSEMBLE CHECK OVER

Seamax Inflatable Boat
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Seamax Inflatable Boat – English User Manual
- 9 -
away from the side chambers and makes the floor installation much easier.
Before Assemble check over
Double check all valves and make sure they are all in the closed position, you can also use the included valve
wrench to ensure all the valves are seated tightly against the floor material. To ensure that the valves are in
the correct position push in and twist the valve stem should be in the up position. To determine this use the
foot pump to pump some air in the floor and then remove hose .if the valve stem is in the correct position the
air will not escape, if it does push down valve stem and twist until valve stem pops up.

Related product manuals