EasyManua.ls Logo

Seiwa S 60E - Commencing Operation

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Operational procedures
4.3 Commencing operation
operating, return t pressure control valve to
"low" and connect suction hose. Suction hose
andreturnhoseare insertedintothepaint that ....
has been prepared in advance.
Caution. _ slowlv turn to "low"
Donotusepaintssuchas lysineetc _ -"
that contain aggregate.
Take note of the allowable operating
time for two-part paints. Make sure
you stop within recommended time an
clean up thoroughly.
When stirring paint take care not to
aerate it. Aeration can cause suction
failure.
2. Check that relief valve is set at "open". Slowly
turn pressure c°ntr°l valve "high" and l?aint _ fill)
will start to come out of return hose. "
3. Remm pressure control valve a half-revolution
4. Turn relief valve to "close".
5. Slowly turn pressure control valve to "high"
while pulling the trigger of the airless gun and "'-"""
paint will come out of the nozzle. Then release
gun trigger and re-set pump to desired spraying I_ {_
6. Adjust pressure control valve to pressure that is _-'- '"
appropriate for the paint then start work. _ D_: _,';/J _, low I'agh
/"-0_ relief xalvc
v _Q.-'_"j
Caution.
._ Turn to Half-turn to
When ilot working or when changing ,,b,,_wJ "close.... low
nozzle always activate safety lock 011 _ #
airless gun to prevent mishap.
Ensureadequate ventilation while ti}
working and work in a location where _ f'"_---"'_
there is good air movement. Wearing a
face mask against dust is recommended
Do not forcefully turn pressure control
valve beyond maximfim setting.
Overloading, can cause breakdown.
6 OPM 101/98