EasyManua.ls Logo

Serta Motion Essentials II - Base Frame Preparation and Setup

Serta Motion Essentials II
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Serta
®
Motion Essentials™ II Owners Manual 99301408
7
INSTALLATION
STEP 5
Remove the plastic packaging from the adjustable base
frame. Carefully rotate the base frame over to position
the base top-side-up.
STEP 4
Remove and extend out power cord from the
protective packaging.
STEP 2
Carefully lift the adjustable base frame from the
shipping carton, keeping the unit top-side-down.
STEP 3
Install (4) legs into the base frame. Simply screw each
leg into a tapped hole at each corner of the base frame
(FIGURE 1).
LEGS – SCREW INTO
TAPPED HOLE AT
EACH CORNER
FIGURE 1
AT LEAST TWO PEOPLE ARE
RECOMMENDED FOR HANDLING AND
MOVING ADJUSTABLE BASE.
WARNING
POWER CORDS MUST NOT INTERFERE WITH
ANY ADJUSTABLE BASE MECHANISMS.
WARNING

Related product manuals