EasyManua.ls Logo

Setec ST-III Series - Installation Guide; Host Equipment Requirements; Installation Personnel; Ventilation Requirements

Setec ST-III Series
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InstallingTheSTIIIPowerSupply
HostEquipment:Thehostequipmentmustensurethataccesstotheunit(other
thanthefrontpanel)bytheuserisprevented.
Personnel:Installationistobecarriedoutonlybysuitablyqualifiedpersonnel.
Ventilation:Provideaminimumof80mmclearanceabove,belowandbehindthe
unit.Thefinalenclosuremustalsoprovideadequateventilationtotheoutside
world(orlargerinternalcavity)topreventthebuildupofhotair.Failuretoprovide
adequateventilationwillmeantheunitmayprematurelytripthermalshutdown.A
minimumventilationof20,000mm2totheoutsideworldmustbeprovided.
CAUTION
Donotinstallunitinsamecompartmentasbatteriesorflammable
materialsuchaspetrol.
Ensurethattheinstallationmeetstheventilationrequirementsabove.
MechanicalandMounting:
Depthofunitis125mm
Aftermountingunit,cliponthefrontfascia(ensurethatalllockingclipshave
engaged)andsecurewithscrewlocatedinsidethefusepaneldoor.
DCcablesmustbesizedtocarrythemaximumfullloadcurrentandtonotexceed
thesystemvoltdroprequirements.Thefollowingcablesizesarerecommended.
Orientation:Theunitistobeinstalledwiththefrontfasciainaverticalplane.
Failuretodothiswillcauseprematuretemperatureshutdown.
9
Cut-out for mounting
152 (h) x 272 (w)
Four by 4.5 x 9mm
Mounting holes at
129.5 (h) x 287 (w)
centres
156.5
303.5
1 2 3 4 5 6 7 8 BATT
Fuse Panel Door
Label Recess
x3 LEDS

Other manuals for Setec ST-III Series

Related product manuals