Work sheet: AB-820 500
Installation of screw connections
03/07/2019
-AB-2 -
4 Hose connections (4 and 6 mm nozzle for OVERPRESSURE)
1. Push the wire or screw clip over the hose
2. Push the hose onto the Cu pipe or hose nozzle (heat or moisten PVC
hose as necessary). The hose must fit tightly all round
3. Wire clip: press together with pliers and push onto the connection
point
Screw clip: push onto the connection point and tighten with screw-
driver
Make sure that the clip is an even tight fit.
5 Hose connections (4 and 6 mm nozzle for NEGATIVE PRESSURE)
For negative pressure applications with which there is no overpressure
on the connection lines even in case of a leak, as point 5 but without
clips.
For negative pressure applications with which there may be overpres-
sure, as point 5.