EasyManua.ls Logo

SGB VLR 410/E - User Manual

Default Icon
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Vacuum leak detector
VLR ..
Documentation VLR
SGB GmbH
Hofstr. 10
57076 Siegen
GERMANY
Art. No.: 605402
Issue: 06/2020
Question and Answer IconNeed help?

Do you have a question about the SGB VLR 410/E and is the answer not in the manual?

Summary

Overview of the Design Variations

Tightness Alarm

Alarm indicating the status of system tightness.

Object and Area of Application

1. Object

Defines the product type and its available versions.

2. Area of Application

Outlines the intended uses and conditions for the leak detector.

2.1 Interstitial Space Requirements

Specifies conditions for interstitial space suitability.

2.2 Material to be Conveyed

Details the materials that can be conveyed and monitored.

2.3 Resistance; Materials

Defines material resistance requirements for detector components.

2.4 Double-walled Pipes

Classifies pipes based on pressure ratings (5 or 25 bar).

Functional Description

3.1 Normal Operation

Describes the standard operational cycle of the leak detector.

3.2 Air Leak

Explains the detector's response and behavior during air leaks.

3.3 Liquid Leak

Details the detector's behavior and alarm triggers for liquid leaks.

3.4 Switching Values

Specifies alarm and pump activation/deactivation thresholds in mbar.

3.5 Display and Operating Elements

Explains the functions of the device's indicators and controls.

3.5.1 Signal Lamp States

Details the meaning of various signal lamp states and their combinations.

Mounting Instructions

4.1 General Notes

Provides essential safety and preparatory notes for installation.

4.2 Mounting the Leak Detector

Guidelines for physically installing the leak detector unit.

4.3 Mounting Pneumatic Lines

Instructions for connecting pneumatic lines and fittings.

4.7 Electrical Connection

Detailed instructions for making electrical connections to the device.

Start-up and Operating Instructions

5. Start-up

Procedures for initial system activation and setup.

6. Operating Instructions

General guidance for operating the leak detection system.

6.1 General Instructions

Basic principles for operating the leak detection system correctly.

6.3 Maintenance

Details routine maintenance procedures and schedules.

6.4 Functional Test

Procedures for testing the device's functionality and safety.

6.5 Alarm

Procedures for responding to and handling alarm signals.

Marking

Appendix TD: Technical Data

Appendix DP: Tightness Test Display Evaluation

Dimension and Drilling Information

Installation of Screw Connections

SGB VLR 410/E Specifications

General IconGeneral
BrandSGB
ModelVLR 410/E
CategorySecurity Sensors
LanguageEnglish

Related product manuals