EasyManua.ls Logo

Sharp AE-Z40KR - Page 46

Sharp AE-Z40KR
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AYZP40KR
5 – 6
8) The 2 screws on the right-hand side of side cover L is removed.
9) The 7 screws of the side cover L and side cover R back is
removed.
10)The connectors in the control box BOX and reactor is removed.
11)A control box BOX fixed 2 screws is removed.
12)A bulkhead plate fixed 2 screws is removed.
13)The conp cover top is removed.
14)A nut is removed and a terminal cover is removed.

Related product manuals