EasyManua.ls Logo

Sharp VC-90ET - Page 26

Sharp VC-90ET
109 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VC-9O0ET
f)
Push
the
(+)
or
(-)
tracking
button
to
check
that
a
flat
response
is
obtained
on
the
envelope
waveform.
g)
Secure
the
guide
roller
by
tightening
the
guide
roller
setscrew
in
the
unloading
mode.
h)
Play
back
the
tape
drive
train
alignment
tape
to
check
that
the
envelope
waveform
does
not
change.
8.
Adjustment
of
A/C
head
X-position.
a)
Push
the
(+)
and
(-)
tracking
buttons
at
the
same
time
to
the
preset
mode.
b)
Rotate
the
X-position
adjusting
nut
with
an
adjusting
box
driver,
and
adjust
the
A/C
head
position
for
maximum
head
switching
pulse
low
side
envelope.
c)
Adjust
the
playback
switching
point.
d)
Check
the
flatness
of
the
envelope
waveform
and
sound
by
playing
back
a
recorded
tape.
X-position
adjusting
nut
AC
head
A
4
een
=
Main
chassis
Figure
1-62.
REPLACEMENT
OF
THE
CAPSTAN
D.D.
(DIRECT
DRIVE)
MOTOR
@
Remove
the
cassette
housing
control
assembly.
®
Removal
(Follow
the
order
of
indicated
numbers.)
Remove
the
three
screws.
Capstan
D.D.motor
la
control
PWB
Remove
the
reel
belt.
Figure
1-63.
MR
element
Remove
the
FFC.
e
Reassembly
1.
Mount
the
capstan
motor
on
the
mechanism
chassis
making
sure
not
to
allow
the
capstan
shaft
to
hit
the
mechanism
chassis,
and
attach
it
with
the
three
screws.
2.
Insert
the
FFC
into
the
capstan
D.D.
motor
control
PWB.
3.
Attach
the
reel
belt.
Notes
:
1.
After
installing
the
capstan
D.D.
motor,
be
sure
to
rotate
the
capstan
D.D.
motor
and
check
the
movement.
2.
Check
and
adjust
the
servo
circuit.
REMOVAL
AND
REASSEMBLY
OF
THE
LOADING
GEAR
BLOCK
Notes
:
The
following
explanation
is
based
on
4-
head
models.
(The
slow
brake
spring
and
slow
brake
lever
are
not
provided
on
2-
head
models.)
1.
Remove
the
cassette
housing
control
assembly.
2.
Remove
the
reel
belt.
3.
Remove
the
reel
block.
@
Removal
Notes
:
1.
Use
care
not
to
deform
the
parts
hooked
to
the
slow
brake
shaft
cap,
take-up
loading
gear,
and
supply
loading
gear
as
shown
in
Figure
1-64.
8-4
Figure
1-64,
2.
In
removing
the
loading
gear,
secure
the
guide
roller
with
a
rubber
band
or
the
like
beforehand
for
easier
reassembly.
Remove
the
E
ring.
Remove
the
relay
gear
drive
“@
;
@
©
‘e
J"
Loading
relay
gear
Remove
the
E
ring.
Unhook
ibe
slow
brake
sprin
Remove
the
slow
brake
cap.
I
Remove
nA
slow
ved
ty
Capstan
D.O.
motor
Figure
1-65.
26

Related product manuals