EasyManua.ls Logo

Sharp VC-A560UA - Page 28

Sharp VC-A560UA
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
VC-A560U(A)/A560U/A560U(B)
VC-H960U/H960U(B)/H961U
4-23 INSTALLING THE MASTER CAM (AT
REAR SIDE OF MECHANISM CHASSIS)
1. Make sure beforehand that the shifter is at initial posi-
tion.
2. Place the master cam in the position as shown below.
Note:
See the figure below for the phase matching between the
master cam synchro gear and pinch drive cam.
3. Finally fix with the E ring.
4-24 REPLACEMENT OF LOADING MOTOR
Removal
Replacement
Remove the loading motor, and install the replacement
loading motor as shown below.
Figure 4-40.
Figure 4-38-2.
The loading motor pressing-in must be less than 14.7 N
(1,500 gf).
Adjust the distance between motor and pulley to 6.95
mm.
Figure 4-38-1.
Figure 4-39.
+0. 2
–0.15
E-ring
Line of synchro gear.
Phase
matching
Phase
matching
Hole of Pinch
drive cam.
Synchro gear
Master cam
6.95 mm
A part
Worm gear
+0
- 0.15
Loading
motor
To press the motor in, first
receive it by portion A.
Apply grease
Worm gear
Apply grease
Apply grease
Apply grease
L-M-Block.
Worm wheel gear.
Leading connect gear.
*Apply grease to
the tip as well.
Loading
motor.
Wire
+ : Red
- : White
Red
Insert

Related product manuals