27
VC-A582U
VC-A582U(A)
VC-H982U
Figure 4-43.
INSTALLING THE SHIFTER
Figure 4-42.
1. Make sure that the loading gear is at the point 1 as
shown below.
2. Install, paying attention to 6 insertion points and 3
release points.
3. For the phase matching at the insertion point 1, see the
point 2 as shown below.
4. Finally fix the inserts 1 and 4.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point 2
Insert
point 1
Half round notch
Shaft 1
Round mark
Loading gear (T)
Insert
point 3
Insert
point 2
Insert
point 4
Insert
point 6
Release
point 3
Rotation
point 2
Phase-matching
point 1
Shaft 1
Shaft 1
Shaft 4