EasyManua.ls Logo

Sharp VC-A582U - Page 27

Sharp VC-A582U
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
VC-A582U
VC-A582U(A)
VC-H982U
Figure 4-43.
INSTALLING THE SHIFTER
Figure 4-42.
1. Make sure that the loading gear is at the point 1 as
shown below.
2. Install, paying attention to 6 insertion points and 3
release points.
3. For the phase matching at the insertion point 1, see the
point 2 as shown below.
4. Finally fix the inserts 1 and 4.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point 2
Insert
point 1
Half round notch
Shaft 1
Round mark
Loading gear (T)
Insert
point 3
Insert
point 2
Insert
point 4
Insert
point 6
Release
point 3
Rotation
point 2
Phase-matching
point 1
Shaft 1
Shaft 1
Shaft 4

Related product manuals