GB-IE Position the "Rail assembly SP18", drill the roof and fix here and also the "L Bracket LB" to the wall.
GB-IE 3 Strips of felt have been supplied .
Fit the 2 lower ones first folding the felt over the roof edging, with an even overhang front and back
then secure with a couple of nails at the top to hold the felt in position and at the bottom nail at
approximately 100mm centres
The third piece overlaps the lower pair and goes over the ridge. Nail at approximately 100mm centres
Screw
(25mm)x06
Felt strips
(FLTs-2.0m)x03
Felt nails
(FN-12mm) x154
Rail assembly
Steps 18-19
22
3mm
13
Tidying the corner