EasyManua.ls Logo

Shire Cubby - User Manual

Shire Cubby
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
© Cubby Playhouse
Version 4 19/07/2017 Julian Shepherd
All informaon, contained in this booklet © Shire Garden Buildings .
Complies with EN71
These instrucons are for your safety. Please read through them thoroughly before use .
PLEASE KEEP THIS LEAFLET FOR FUTURE REFERENCE
Question and Answer IconNeed help?

Do you have a question about the Shire Cubby and is the answer not in the manual?

Summary

Important Information

Safety

Essential safety guidelines for assembly and use.

Base and Positioning

Recommendations for preparing the base for the playhouse.

Warranty

Details of the product's warranty terms and coverage.

Base and Warranty

Preparation of Base

Recommendations for building a stable and correctly sized base for the playhouse.

Warranty Terms

Details of the 10-year anti-rot warranty and exclusions.

Before You Start

Pre-Assembly Checks

Ensuring the base is ready, parts are checked, and instructions are read.

Tools Required

List of essential tools needed for the assembly process.

Care, Maintenance and Recycling

Golden Rules of Care

Five key principles for looking after the playhouse.

Golden Rules of Maintenance

Seven important guidelines for regular upkeep of the playhouse.

Recycling and Disposal

Information on how to recycle and dispose of packaging and building components.

Hardware Chart

Detailed Technical Drawing

Parts List

Assembly Instructions

Door Architraves and Glazing

Attaching door architraves and fitting plastic glazing to the door.

Hinges and Door Handle

Attaching hinges, ring handle, and wooden knob to the door.

Door Panel Attachment

Laying and attaching the door panel to the door frame.

Window Insert Rebate

Rebating the window insert for proper fit and EN71 compliance.

Window Hinge Fitting

Positioning and fitting the window hinges to the window insert.

Window Fixing

Securing the window insert using screws after initial positioning.

Casement Stay Installation

Loosely fitting casement stays and pins, then marking and fixing pins.

Floor and Wall Panels

Attaching floor panels and side/back wall panels to the frame.

Adding Wall Panels

Continuing to add and fix side-plain wall panels to the structure.

Gable Panels Attachment

Fixing the front and back gable panels to the main framework.

Safety Vent Installation

Inserting safety vents into the pre-drilled holes in the back gable panel.

Roof Framework Assembly

Positioning and nailing roof framework onto the roof panels.

Roof Framework Cutting

Cutting centre roof framework pieces for the roof peak.

Roof Panel Placement

Placing and aligning roof panels on the building structure.

Joining Roof Panels

Holding and nailing the roof panels together to secure them.

Fixing Roof Panels to Walls

Positioning and nailing roof panels to the building walls.

Cover Strips Installation

Fitting cover strips at each corner of the roof with nails.

Veranda Posts Assembly

Attaching veranda posts to veranda rails, ensuring mirror images.

L Brackets for Veranda

Attaching L brackets to each veranda rail for stability.

Veranda Alignment and Trim

Aligning veranda posts to the roof underside and trimming as necessary.

Rail Assembly Fixing

Positioning and fixing the rail assembly, including L brackets, to the roof and wall.

Roof Felt Application

Fitting roof felt strips, overlapping and securing them with nails.

Fascia and Diamond Fitting

Attaching fascia and flat bottom diamond pieces to the gable framework.

Beading and Glazing

Removing protective film and fitting beading and plastic glazing.

Roller Catch Attachment

Attaching the roller catch and door catch block to the door and frame.

Securing Walls to Floor

Fixing the assembled walls securely to the floor using screws.

Shire Cubby Specifications

General IconGeneral
BrandShire
ModelCubby
CategoryToy
LanguageEnglish