EasyManua.ls Logo

Siemens m50 Series - Page 43

Siemens m50 Series
47 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EPAC300-M50 SERIES USER’S MANUAL
AUGUST 2005 PAGE 42 OF 46
1 . Bundle high voltage (120 VAC) wires separately from low voltage (12 or 24 VDC)
signals. Service power, load switch wires to signal heads, etc., should never be
bundled with I/0 wires connected to the EPAC M50-Series I/O wires or to the
communications wires.
2. Route the high voltage bundles away from the low voltage bundles. A good
practice is to bring all high voltage wires in from the left, and low voltage from
the right, or vice versa.
3. Separate electrical noise sources (such as sparking contacts of mechanical
relays) from low-voltage bundles.

Related product manuals