Connecting up   
4.5 Assembling an IE hybrid cable 2 x 2 + 4 x 0.34 with an IE IP 67 hybrid connector 
  SCALANCE W788-xPRO/RR / SCALANCE W74x-1PRO/RR 
98  Operating Instructions (Compact), Release 08/2007, A5E00413342-05 
Remove the assembled data module from the IDC 
assembly tool. 
Position the top shield plate and press it over the cable 
shield. 
Position the lower shield plate and press it and the 
upper shield plate together until they lock together with 
an audible "click". 
Arrange the power leads and insert them as far as they 
will go into the hinge elements of the isolation body. 
The following table shows the assignment of the power 
leads. 
 
 
Wire color code (standard)  Brown  Brown  Black  Black 
Function  24 V  48 V PoE Ground  Chassis 
PoE 
Power supply insert module  1  2  3  4