EasyManua.ls Logo

Siemens SCALANCE W788-1PRO - The HiPath Access Point Mode

Siemens SCALANCE W788-1PRO
132 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connecting up
4.6 Fitting the IE FC TP standard cable 4 x 2 GP to an IE IP 67 hybrid connector
SCALANCE W788-xPRO/RR / SCALANCE W74x-1PRO/RR
100 Operating Instructions (Compact), Release 08/2007, A5E00413342-05
4.6 Fitting the IE FC TP standard cable 4 x 2 GP to an IE IP 67 hybrid
connector
Procedure
Remove the two inner shells of the universal sealing ring
to adapt it to the diameter of the hybrid cable.
Push the bushing, washer, adapted universal sealing
ring and the housing over the cable jacket.
25 mm
30 mm
Remove the following lengths of cable jacket and shield
braid:
25 mm for the power leads
30 mm for the data leads
To achieve good shielding, the shield braid must be alt
least 30 mm long.
Arrange the data leads according to the color codes on
the splice element. The following table shows the
assignment of the data leads.
Wind the shield braid around the data leads. As a result,
the shielding of the cable has contact to the shield plate
of the splice element that will be fitted later.

Table of Contents

Other manuals for Siemens SCALANCE W788-1PRO

Related product manuals