SDBS 2400 A1
GB
│
IE
│
NI
│
CY │ 9 ■
Setting up and connecting
Package contents and transport inspection
The appliance is supplied with the following components as a standard:
● Steam Generator Iron
● Velcro tape for fastening the mains cable
● Operating instructions
NOTE
► Check the package for completeness and signs of visible damage.
► If the delivery is incomplete or damage has occurred as a result of defec-
tive packaging or during transport, contact the Service hotline (see section
Service).
Unpacking
♦ Remove all parts of the appliance and the operating instructions from the box.
♦ Removal packaging material and protective film.
WARNING
Do not allow children to play with packaging materials. There is risk of suffoca-
tion.
Set-up location requirements
The work service on which you place the base station must be stable, flat and
heat-resistant.
Electrical connection
♦ Insert the power cable plug into a properly connected and earthed mains
power socket which supplies the voltage stated in the “Technical data”
section.