EasyManua.ls Logo

Simpson GCN-MEP - GCN Fuel Cell Installation; Preparing and Installing the GFC34 Fuel Cell

Simpson GCN-MEP
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
T-SAS-GCNM12 ©2012 Simpson Strong-Tie Company Inc.
-14-
PREPARING AND INSTALLING THE FUEL CELL (GFC34)
GENERAL OPERATING INSTRUCTIONS FOR THE
GCN150/GCN-MEP GAS-ACTUATED TOOL
1. Remove safety cap from metering valve.
2. Insert front legs of metering valve inside
top shoulder of fuel cell.
3. Push the back legs inside top shoulder of
fuel cell until it snaps into place.
4. Place fuel cell into fuel compartment with
meter valve end in the upward position.
5. Push the metering valve stem into the red
triangle carburetor.

Related product manuals