Installation and Maintenance
Service Manual
(2) IPM Protection, Out-of-step Fault, Compressor Phase Overcurrent (AP1 below refers to the outdoor control
panel)
Main check points:
●Is the connection between control panel AP1 and compressor COMP secure? Loose? Is the connection in correct order?
●Is the voltage input of the machine within normal range? (Use AC voltmeter to measure the voltage between terminal L and N on the
wiring board XT)
●Is the compressor coil resistance normal? Is the insulation of compressor coil against the copper tube in good condition?
●Is the working load of the machine too high? Is the radiation good?
●Is the charge volume of refrigerant correct?
Fault diagnosis process:

Table of Contents

Other manuals for Sinclair ASH-12AIE2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sinclair ASH-12AIE2 and is the answer not in the manual?

Sinclair ASH-12AIE2 Specifications

General IconGeneral
BrandSinclair
ModelASH-12AIE2
CategoryAir Conditioner
LanguageEnglish

Related product manuals