EasyManua.ls Logo

Slayer 2 Group - Unpack Equipment

Slayer 2 Group
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 2: Unpack Equipment
Your Slayer espresso machine will arrive in a lidded wooden crate, bolted to a pallet
at the base. Unpack with the following steps.
Parts and tools:
Phillips-head screwdriver
Two (2) Rubber feet (included)
Steam handles (included)
Drip tray mirror (included)
Three (3) nuts for drip tray mirror (included)
Procedure:
1. Use a phillips-head screwdriver to loosen and remove the screws
(approximately eight [8] screws) located along the lower edge of the crate.
2. Carefully lift the lid from the pallet.
3. Remove all banding and packing material from the machine.
4. Use a phillips-head screwdriver to loosen and remove the screws
(approximately two [2] screws) from the base of the pump, then detach it
from the pallet.
5. The machine is attached to the pallet with two (2) bolts that are screwed into
two (2) of its four (4) legs, one on each side of the machine. Use a socket
wrench to loosen and remove the two (2) bolts from the underside of the
pallet.
6. Attach the included rubber
feet to the bottom of the two
(2) legs that were bolted to
the pallet.
7. Prepare surface by laying out
one or more towels, which
will rest under the machine’s
feet and allow for easy sliding
into desired position.
8. Holding the machine by the
lower part of the Xs, as
shown, employ two (2) or
more people to lift the
machine up and onto the
towels on the prepared
surface.
9. Slide machine into desired
position, then left legs, one or two at a time, to remove towel(s).
10.Attach the steam handles by threading into place.
11.Attach the drip tray mirror using the three (3) included nuts.
12. Pull both steam actuators forward, into the “on” positions. Leave steam
actuators in the “on” positions until “Step 8: Turn on Heating Elements”.
11
Lift Here

Related product manuals