13 Decommissioning
SMA Solar Technology AG
Operating manualSTP110-60-BE-en-1698
5. If the inverter is to be lifted out of the mounting
bracket without using a hoist, screw the transport
handles as far as they will go into the tapped holes
on the right-hand and left-hand side until they lie
flush with the enclosure. When doing so, ensure that
the carrying handles are screwed into the threaded
holes so that they are perfectly straight. If the
carrying handles are not screwed in straight, this
can make it more difficult or even impossible to
unscrew them later on and can damage the
threaded holes to the extent that carrying handles
can no longer be screwed into them.
6. Remove the inverter from the bracket and place it in the transport packaging or on a suitable
surface.
7. Remove all 4 carrying handles from the threaded holes or remove the eye bolts of the lifting
gear and once again screw in the sealing screws (flat-blade screwdriver 4mm, tightening
torque: 2Nm).
8. Remove the mounting bracket from the wall or profile rails.
9. Remove the mounting bracket by disconnecting the bracket parts from the connecting rod
(PH2).
10. If the inverter is to be stored or shipped, pack the inverter and the parts of the mounting
bracket. Use the original packaging or packaging that is suitable for the weight and
dimensions of the inverter and secure with tie-down straps on the Euro pallet.
11. Dispose of the inverter in accordance with the locally applicable disposal regulations for
electronic waste.