EasyManua.ls Logo

SMA STP 25000TL-30 - Page 84

SMA STP 25000TL-30
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13 Decommissioning the Inverter
SMA Solar Technology AG
Operating manualSTP15-25TL-30-BE-en-1784
8.
CAUTION
Risk of burns due to hot enclosure parts
Wait 30 minutes for the enclosure to cool down.
9. If the inverter is protected from being lifted off, unscrew the screws out of the lower drill holes
in the rear panel of the inverter.
10. Remove the inverter by lifting it up and off the wall mounting bracket.
11. If the inverter is to be stored or shipped in packaging, pack the inverter, the wall mounting
bracket and, if applicable, the DC load-break switch. Use the original packaging or
packaging that is suitable for the weight and dimensions of the inverter.
12. Dispose of the inverter in accordance with the locally applicable disposal regulations for
electronic waste.

Table of Contents

Other manuals for SMA STP 25000TL-30

Related product manuals