Electrical Connection SMA Solar Technology AG
28 STP10-17TL-IEN102611 Installation Guide
Cable Requirements
6.3.2 AC Connection Procedure
1. Check the grid voltage and compare it with the permissible voltage range (see section
14”Technical Data” (page99)).
2. Disconnect the line circuit breaker from all 3 phases and and prevent it from being reactivated.
3. Loosen all 6 captive screws of the lower lid.
4. Lift the lower lid upwards and remove it.
Position Name Value
A Cable diameter 14 ... 25 mm
B Conductor cross section Max. 16 mm²
C Strip insulation Approx. 12 mm
The PE wire must be 5 mm longer than the L and N conductors!