EasyManua.ls Logo

Snorkel UL32 - Page 43

Snorkel UL32
115 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 3 - 9UL25/UL32/UL40
3. Slide #4 mast out of #3 mast. As mast is removed, the bottom four mast bearings will fall out;
note their orientation for re-assembly.
4. Disconnect the chain from the top of the #2 mast.
5. Remove the cylinder by following instructions provided under the section named “CYLINDER
ASSEMBLY”.
#3 MAST
1. Remove the sequence strap retainer on the top of #1 mast.
2. Remove the Allen head screws holding the top mast bearings between the #2 and #3 mast. Re-
move the top mast bearings.
3. Slide #3 mast out of #2 mast. As mast is removed, the bottom four mast bearings will fall out. Its
important to note their orientation for re-assembly.
#2 MAST
1. Remove the Allen head screws holding the top mast bearings between the #1 and #2 mast. Re-
move the top mast bearings.
2. Slide the #2 mast out of the #1 mast. As mast is removed, the bottom four mast bearings will fall
out. Its important to note their orientation for re-assembly.
SERVICE AND REPAIR

Table of Contents

Other manuals for Snorkel UL32

Related product manuals