Likewise, peg down the pole on the tarp side and then apply tension to the four ropes.
5
Complete the set up process by pegging down all four points and applying tension using
the rope tensioner.
6
Ground
Rope Tensioner
Peg
Rope
90°
Be careful not to let the tarp sag.
Peg down
according to tape
direction.
4
Place the tarp-side pole (280cm) on theground andpeg down the forked rope attached to
the tape-side pole tip.Then, set the rope at a 45° angle to the pole and drive the peginto
the ground,angled towardthe rope at90°.
8
TensionTension
Tape Tape
Pole Pole
Forked 10m (32.8') RopeForked 10m (32.8') Rope
45°45°
45°45°
45°45°
45°45°
45°45°
45°45°
Tension
Tension
Peg downPeg down Peg down
Peg down
Peg down
Peg down Peg downPeg down