INSTALLATION INSTRUCTIONS
FOR PART #20100 STAGE 3
BOOST COOLER®
WATER/METHANOL INJECTION
SYSTEM
Parts List
o UHO (Ultra High
Output) Pump
o 3Qt Reservoir
o 10 ft. 1/4” OD Tubing
o 3ft. Black Wire Loom
o 18” 1/8” Silicone Tubing
Electrical Packet
o 2 Wire Splices
o 2 Butt Connectors
o Vacuum “T”
o 2 Small Eyehooks
o 1 Female Connector
o 1 Male connector
o 10 Tie Wraps
o 5” Double Sided Tape
o Stage 3 Controller
o Level switch Upgrade
Required tools
- Electric drill w/ drill bits
- Adjustable wrench
- Utility knife
- Screw driver – Phillips
- 5/16” open end wrench (for
nozzle)
-1/8” NPT Tap
Mechanical Packet
o 1 Nozzle Holder
o 8 #8x1&1/2in. Screws
o 8-#8 Washers
o 4 #6x1/2in. Screws
o 1 Tube E6000 GOOP®
Nozzles
o 1 Reservoir Fitting 3/8”
NPT to ¼” tube
o
60ML/MN (1)
o 100ML/MN (2)
o
175ML/MN (3)
o 225ML/MN (4)
o 375ML/MN (5)
o 625ML/MN (6)
Upgrades
o Bulkhead
o 2.5 Gallon Reservoir
o
Solenoid
o Hose Adaptor or Bung
o SafeInjection®
o Nitrobooster®
o Dual Nozzle
o Carb Plate
Introduction:
The Stage 3™ System is designed to deliver precise amounts of water-
methanol in a wide range of operating conditions. The control module for