103
General instructions
• The installation must not change or impair the existing ceiling stand.
• The electrical connection must be made outside the installation frame (inspec-
tion access).
• The minimum distances given in appendix 2 indicate the free space for air circu-
lation. These must not be reduced or covered by insulation or similar.
Installation steps:
• Create a ceiling cut-out with the dimensions given in appendix 2.
• Connect the heater to the electricity.
spring (2) back at the installation frame and also insert this side in the ceiling
cut=out.
• Position the retaining springs (2) against the inside of the ceiling cut-out.
Please observe the special assembly instructions supplied with the additional ac-
cessories.