Quick Installation Guide
X3-Forth 40.0kW-150.0kW
Packing List
Mounting the inverter on the wall
Bracket
Nut
- Use the bracket as a template for marking the
- Hammer the M8x80 expansion screw
into four holes.
- Drill the four holes with a φ10 drill.
- Depth: at least 65 mm.
- Screw in the nut firmly with socket wrench.
- Lift up the inverter.
- Two methods are available
by four installers or lifting ring
position of holes with a level and marker.
Expansion screw
-Hang it onto the bracket - Fix it on the wall bracket with M8 bolts
Mounting the inverter on the stand
Bracket
M10x40 screw
- Use a bracket as a template for marking the
- Screw in the M10x40 screw into holes.
- Drill the four holes with a drill.
- Tighten it firmly with corresponding
socket wrench.
position of the holes with a level and marker.
- Lift up the inverter.
- Two methods are available
by four installers or lifting right
- Hang it onto the bracket - Fix it on the stand with M8 bolts
- Insert the stripped section into OT terminal.
- Pull the heat-shrink tubing over grounding cable
- And crimp with crimping tool
A=B+(2~3mm)
B
- Strip the 35-70 mm²grounding cable insulation
- Select OT copper terminal (M8)
C=A+2 cm
- Pull the heat-shrink tubing onto crimped section of OT terminal
- The tubing must be at below stripped cable section
- Use hot-air blower to shrink it
so that they are in firm contact with OT terminal
- Connect the grounding cable to grounding
point on the inverter
- Tighten it with torque 10-12 N.m
Grounding connection
- Pull the heat-shrink tubing over the crimped section of OT terminal.
-Use hot air blower to shrink it so that they are in firm contact with OT terminal.
Heat-shrink tubing
Grid connection
PV connection
- Disassemble the DC contactor
Positive DC contactor
Positive PV pin
Positive terminal
Fastening head
Negative DC contactor
Negative PV pin
Negative terminal
Fastening head
6 mm
Cable size: 10 AWG
- Strip the PV cable insulation
- Connect the PV cable to the corresponding PV port
I
I
Tighten the fastening head
Positive DC
PV pin
Negative DC
PV pin
Clamp pin
(Torque: 3-4 N·m)
Positive terminal
Negative terminal
*Note: The double offset ring wrench in the accessory bag is used to remove the screws on the front cover of the inverter. Keep it in a safe place
*Note: Screws used for installation on the wall are not in the accessory bag. Please prepare them in advance.
Communication connector x1
Double offset ring wrench x1
X3-Forth inverter x1
Positive DC pin contact x24
Negative DC pin contact x24
Bracketx1
M10xL40 Bolt combination x4
M8Boltx2
Female DC connectorx24
Male DC connectors x24
WiFi (Optional)
Installation guide x1
Installation guide
X3-Forth 40.0kW-150.0kW
A
D+(2~3) mm
B
A≤260 mm
B≤150 mm
a≤45 mm
12.5≤b≤15 mm
D
L1 / L2 / L3 / N
L1
L2
L3
N
PE
- Select the appropriate OT terminal and 70~240 black, red and yellow and green copper cable mm²
- use wire stripper to strip the insulation layer of the AC cable end.
-The stripped insulation layer shall be 2-3mm longer
than “D” part of OT terminal as shown below.
- Pull the heat-shrink tubing over AC cable.
- Insert the stripped section into OT terminal and crimp with crimping tool.
Separate PE cable
Multi-corecable
-Un-install the screws on the cover to open the cover of the wiring box.
-Use utility knife to cut out the pagoda type protection ring in accordance with the whole cable size,
-Put the AC cable through the pagoda protection ring, and connect it to the AC terminals L1, L2, L3 and N in turn,
and tighten it with torque wrench (with the torque of 25-30 N·m).
-Re-install the cover of wiring box with the torque of 5~7 N·m.
User manual x1