I
Packing List
Quick Installation Guide
-Mark position of five holes.
-Align the halves connectors
7 mm
7 mm
PVconnectionsteps(PV cable size:12AWG):
3.Insert AC cable into Grid port
through screw cap.
a.L-wire,N-wire connection
b.PE wire connection
4. Connect the wire to the AC terminal in the inverter.
AC connectionsteps(AC cable size:refer to table1):
1.Remove thetop-down cover.
2. Make AC wires.
PV and AC Connection
EPS wiring diagram
For Australia/New Zealand
For other countries
EPS connection steps:
Note: ConnectPEwire into
PE port at right !
1. Make wire(EPS cable size: refer to table 2)
2. Insert EPS cable into EPS port through screw cap.
Note: The right most port
should not be connected !
EPS Connection(for E Version )
Communication interface bewteen inverter and battery is CAN with a RJ45
connector.
Note:
The battery communication can only work when the battery BMS iscompatible
withtheinverter.
B:Communication Connection Steps:
A:Power Connection Steps:
BMS_CANH
GND
BMS_485A BMS_485B
GND
NTC
GND
BMS_CANL
Definition
2
3 4
5
6 7 81
PIN
Press down spring until it clicks audibly into place
The ne wire strands must be seen in the champer
wire strands
Lithium Battery Connection(optional)
Before connecting to battey, please install a nonpolarized DC breaker to make
sure inverter can be securely disconnected during maintanance.
Battery breaker
Voltage
Current[A]
32A
Model
X3-Hybrid-5.0-D
X3-Hybrid-5.0-N
X3-Hybrid-6.0-D
X3-Hybrid-6.0-N
X3-Hybrid-8.0-D
X3-Hybrid-8.0-N
X3-Hybrid-10.0-D
X3-Hybrid-10.0-N
Nominal voltage of DC breaker should be larger than maximum
voltage of battery.
X3-Hybrid 5kW-10kW
Mounting Steps
Cable
4-5mm²
Micro-breaker
4-5mm² 4-5mm² 5-6mm²
20A 20A 25A 32A
Model
X3-Hybrid-5.0-D
X3-Hybrid-5.0-N
X3-Hybrid-6.0-D
X3-Hybrid-6.0-N
X3-Hybrid-8.0-D
X3-Hybrid-8.0-N
X3-Hybrid-10.0-D
X3-Hybrid-10.0-N
table1
table2: Cable and Micro-breaker recommended
EPS Cable
≥5mm²
EPS breaker
≥5mm² ≥5mm² ≥5mm²
25A 25A 32A 32A
Model
X3-Hybrid-5.0-D
X3-Hybrid-5.0-N
X3-Hybrid-6.0-D
X3-Hybrid-6.0-N
X3-Hybrid-8.0-D
X3-Hybrid-8.0-N
X3-Hybrid-10.0-D
X3-Hybrid-10.0-N
Overview of PV connection
E Version For Other Countries
E Version For AU/NZ
This function can be achieved manually or automatically according to
user’s preference.
For manual solution, please install an external switch.
L 1
L 2
L 3
N
P E
60mm
12mm
L 1
L 2
L 3
N
60mm
12mm
high-voltage lithium battery.
+
-
CAN
Nonpolarized
DC breaker
Power connection
Communication connection
positive DC
pin contact
negative DC
pin contact
cable
clamp contact
nut
male plug
female plug
tight nut
60mm
12mm
L 1
L 2
L 3
N
P E
L1
L1
L2
L2
L3
L3
N
N
SolaX
meter
+
-
Battery
E-BAR
Main switch
RCD
PV1+
PV1 -
PV2+
PV2 -
PE
SolaX X3-Hybrid inverter
Loads
L2
L1
L2L1 L3
N
L3
N
EPS
Loads
L2L1 L3
N
RCD
N-BAR
the cable is not
required for
Australia
Changeover device with
interlocked switching
SolaX
meter
+
-
Battery
DPDT
E-BAR
Main switch
RCD
PV1+
PV1 -
PV2+
PV2 -
PE
SolaX X3-Hybrid inverter
Loads
L2
L1
L2L1 L3
N
L3
N
L1
L1
L2
L2
L3
L3
N
N PE
EPS
Loads
L2L1 L3
N
RCD
Australia/New Zealand other countries
Battery connection diagram
BMS PIN Denition
Inverter X1
X3-Hyb rid 5kW-1 0kW
Bracket X1
Expansion bolt X5
(positive X3, negative X3)
DC connectors
(positive X3, negative X3) AC terminal X12 Grounding nut X1 Set screw(for mounting) X2
Warranty card X1
Quick installation guide X1 Wifi module(optional) X1 Smart Plug(optional) X1
Battery connectors
(positive X1, negative X1)
DC pin connectors
Ring terminal X2
User manual X1
Step3: Assemble the cable gland and
screw the cable nut.
Step1: Disassemble the BMS cable gland.
Step2: Prepare a communication
cable(without sheath)and insert
the communication cable through
the cable nut.
E E
E
E
8 pin terminal X1
NTC X1 Scope tape X1
Note: For lead-acid battery connection, please refer to Important Instruction for lead acid battery.
- Tighten the expansion tubes.
- Drill holes with φ10 drill.
- Depth: at least 60mm.
- Screw the expansion screws.
- Match the inverter with the bracket.
- Screw the cross recessed screw on the bracket.
PE
B
M
S