Pre Start-Up Check List
______ 1. Unit is level and locked in position.
_______ 2. Pump suction flooded, with short run to feed tank. NO vacuum lift or pump starvation.
_______ 3. Discharge piping diameter large enough to accept full flow with minimum back pressure.
NO RESTRICTIONS!
_______ 4. Pressure gauge is fitted with a diaphragm seal....Put Wrench On Bottom Only to tighten.
DO NOT TURN GAUGE!
_______ 5. Sonolator connected properly, fittings tightened using ALUMINUM wrenches provided.
_______ 6. Voltage and overload relays matched to motor. All wiring installed properly and safely.
_______ 7. For continuous cavity pumps, pump motor rotation checks with "arrows" on pump drive end.
Note: electrician may "jog" unit when dry.
_______ 8. Variable speed control handle on pump/motor set to LOW speed - VARIABLE SPEED CONTROL
HANDLE MUST NOT BE TURNED UNLESS MOTOR IS RUNNING.
_______ 9. Install Acoustic Intensity Meter with bracket provided. Connect cable between meter and
Sonolator probe. Depress Acoustic Meter "Test" switch, making sure a reading is obtained. READ
ACOUSTIC INTENSITY METER INSTRUCTION MANUAL.
_______ 10. Make sure proper filtration is installed prior to the Sonolator System to protect the pump and
Sonolator.
_______ 11. STOP! Read and follow carefully the Start-Up Procedures outlined on the following pages.
DO NOT RUN UNIT DRY!
IF THIS IS A DEMONSTRATOR UNIT YOU MUST RETURN IT CLEAN!