EasyManua.ls Logo

Southwire MAXIS XD1 - Page 6

Southwire MAXIS XD1
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
109
SETUP AND OPERATION SETUP AND OPERATION
C. When pulling from the side, make a loop in the end of the
polyline/ mule tape and attach the eye around the Polyline/Mule
Tape Pin (10) on the Capstan (1) (Fig 7). This will allow the
polyline/mule tape to continuously accumulate onto the
Capstan (1) (Fig 8). Switch the 18-Volt drill into REVERSE
and engage drill motor.
Fig 7 Fig 8
ROPE PULL SETUP
A. When pulling underground or from below, wrap rope over
the top of Capstan (1) in a clockwise direction multiple times
(Fig 9) and switch the 18-Volt drill into REVERSE and payoff like
most conventional wire pullers.
Fig 9
B. When pulling overhead or from above, pull forward pin on
Front Extension (6) and rotate 180 degrees and insert back into
Base Arm (5) and reinstall pin (Fig 5 and 6). Wrap rope under
the bottom of the Capstan (1) and wrap rope counter-clock-
wise. Ensure 18-Volt drill is in FORWARD and payoff like most
conventional wire pullers.
Fig 5 Fig 6
C. When pulling from the side, wrap rope around Capstan (1)
across the top of the Capstan (1) wrap the rope in a clockwise
direction multiple times and switch the 18-Volt drill into
REVERSE and payoff like most conventional wire pullers.

Related product manuals