EasyManua.ls Logo

Speck pumpen NPY-2051 User Manual

Default Icon
116 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Betriebsanleitung
Baureihen CY, CSY, LNY,
LSY, NPY, PY, Y, YS
Kleinkreiselpumpen mit Peripheralrad,
Gleitringdichtung und Metallgehäuse
Originalbetriebsanleitung
Dokumentation
Betriebsanleitung vor der ersten Inbetrieb-
nahme unbedingt lesen!
Dieses Dokument sowie alle Dokumente im
Anhang unterliegen keinem
Änderungsdienst!
Technische Änderungen vorbehalten.
Speck Pumpen Walter Speck GmbH & Co. KG
Regensburger Ring 6 8, 91154 Roth / Deutschland
Postfach 1453, 91142 Roth / Deutschland
Tel.: +49 (0) 9171 809 0
Fax: +49 (0) 9171 809 10
E-Mail:
info@speck-pumps.de
Internet:
www.speck-pumps.de
Ausgabe:
05/2011
ersetzt Ausgabe:
11/2010
Dok./ Art.-Nr.:
1096.0821

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Speck pumpen NPY-2051 and is the answer not in the manual?

Speck pumpen NPY-2051 Specifications

General IconGeneral
BrandSpeck pumpen
ModelNPY-2051
CategoryWater Pump
LanguageEnglish

Summary

Important Basic Information

Warnings and Symbols

Explains warning symbols, their security level and consequences of non-observance.

Safety

Intended Use

Specifies the correct application and usage of the pump/aggregate.

Potential Misuse

Outlines potential incorrect uses that could lead to hazards or damage.

General Safety Instructions

Provides general safety guidelines to be observed before performing any work.

Design and Functioning

Set-up and Connection

Preparing Set-up

Covers checks for ambient conditions, clearances, and installation site preparation.

Set-up on Torsion-Resistant Level Surface/Frame

Explains how to position and secure the pump on a stable surface.

Planning Pipe System

Guides on dimensioning pipe supports, connections, and pipe lengths.

Connecting Pipes

Details procedures for connecting suction and pressure pipes.

Electrical Connection

Covers motor connection, protection, and checking rotation direction.

Operation

Preparations for Commissioning

Details checks and steps before starting the pump for the first time.

Commissioning

Covers the procedures for starting up and operating the pump.

Maintenance and Servicing

Disassembly

Explains how to safely disassemble the pump for maintenance or repair.

Disassembly of LNY-/LSY-2841

Step-by-step guide for disassembling specific pump models.

Troubleshooting

Technical Data

Operating Limits

Specifies the operational boundaries for different pump series.

Related product manuals