Speck Pumpen Vakuumtechnik GmbH
zertifiziert: DIN EN ISO 9001
Supplementary Operating Instructions for Explosion Protection
19
FS- 04
ok
no
yes
Compressor
operation
ON
Check:
- service liquid supply
- service liquid circulation
Delay of the
flow-rate testing
after switching on
Check:
- service liquid supply
- service liquid circulation
Operating time
>5s...90s
yes
no
Check:
- service liquid supply
- service liquid circulation
- temperature of the extracted gas
Check:
- pipe at the pressure side
TS+ 05
ok
no
yes
PS+ 06
ok
no
yes
Start
Compressor
Compressor
in operation
yes
no
! Take note of Fig. 7.13 !
Stop key
activated
no
yes
! Take note of Fig. 7.15 !
! Take note of Fig. 7.14 !
Shut down
compressor
Compressor
emergency
cut-off
Compressor
operation
OFF
Valid for: C
- Compressor with magnetic
coupling (comp. Fig. 7.3)
- no operating liquid feeding to the
pressure casing (comp. Fig. 7.1)
ategorie 1G
-
(i) (a) 2G
significant fluctuation of the
liquid level in the separator
LS- 01
ok
no
yes
Check:
- service liquid supply
- service liquid circulation
Check:
- service liquid supply
- Blockade of the compressor
- internal liquid insufficiency
TS+ 10
ok
no
yes
Check:
- service liquid supply
- service liquid circulation
LS- 02
ok
no
yes
Check the counter pressure
only if there is no free outlet
to the environment
LS- 03
ok.
nein
yes
Fig. 7.11 MCR-diagram for compressors of category 1G (inside) / 2G/D (outside)