24
6.2 Commissioning - Quick set-up
This section allows the user to carry out the minimum commissioning necessary to operate
the system.
It accepts the defaults set in the factory, so will only work if the original default settings have
not been altered - See Section 10.10, 'Default settings' to confirm.
Settings can then be tailored to suit the individual requirements of the customer / application
if required.
Warning
It is essential that you comply with National / Local regulations and Guidance notes,
and the boiler manufacturers' recommendations. It is imperative that the settings
you have accepted will allow the boiler to operate in a safe manner.
Warning
It should be noted that additional cooling capacity must be installed for applications
where frequent blowdown is required.
All BDV60 blowdown vessels are designed with two threaded connections for installing
a Spirax Sarco self-acting cooling system. In the UK and in many other countries the
cooling system should be set to maintain BDV60 water discharge at a temperature
below 43°C
Quick set-up - Commissioning
For a single boiler installation, without a blowdown valve switch fitted, and with a recovery
time of 4 hours.
Parameter Set to
1. Clock
- Hours
- Minutes Actual time and date
- Month
- Year
2. Duration of blowdown
Depends on installation and water condition, but 5 seconds
is the recommended maximum initially
3. Start time, repeat, Set the blowdown sequence as required; start time, repeat,
stop time, days stop time, day
4. Recovery time 4 hours
Test the system to ensure that it is working correctly.