EasyManua.ls Logo

Springfree S113 - Step 4: Mat Installation; Mat Placement and Alignment; Frame Bolt Tightness Verification

Springfree S113
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
Lay out the mat with the yellow stripes facing upwards inside the trampoline frame.
The blue tags on the mat should approximately align with the blue stickers on the frame.
NOTE - Before proceeding, double check that all of the bolts and nuts are tightened. Use
the tools provided to fasten the nuts. Do not over tighten the nuts. Do not use power driver,
torque wrench, or drill.