5. OPERATION
CAUTION: Do not install the side chute and mulching plug if you intend to bagging.
Before installing, make sure the grass box has been properly attached to the metal grass
collection box
7
frame via the clips around the mouth of the box.
Lift the rear discharge door. While holding the door open, place the grass collection box
7
with handle side up into the grooves under the hinge of the rear discharge door, making sure
that the hooks rest properly inside their respective grooves.
After stopping , lift the rear discharge door
12
, take the grass collection box 7 away.
Installing the grass collection box-Bagging
When shipped,the wheels on the mower are set to a low-cutting position.Before using the
mower for the rst time,raise the cutting position to the height best suited for your lawn.
To adjust the blade height:
Disconnect power supply.
To raise the blade height, use your hands to adjust the cutting height adjustment handle
9
.
Connect to power supply when you are ready to mow.
Setting the cutting height
CAUTION: Do not install the grass collection box and side chute if you intend to mulching.
Lift up the rear discharge door .
Grab the handle of the mulching plug and slide it into the opening in the back of the mower.
Lower the rear discharge door.
CAUTION: Do not install the grass collection box, the side chute and mulching plug if you
intend to rear ejection.
Lift up the rear ap
12
.
Lift up the rear ap plate
13
vertically and make sure the plate is xed rmly.
Connect to power supply when you are ready to mow.
Installing the mulching plug-Mulching
Installing the rear ap plate-Rear ejection
230230
FR
ES
PT
IT
EL
PL
RU
EN
KZ
UA
RO