OPERATION
INSTALLATION
6 |ACCELERA 300/WHP 300 WWW.STIEBEL-ELTRON.COM
9. Installation
Only qualified contractors must carry out the installation in accor-
dance with these instructions.
9.1 Transport
To protect the appliance against damage, it must be transported
vertically inside its dedicated packaging. Where space is restricted,
you may also move the appliance tipped backwards at an angle.
9.2 Ambient temperature
!
The appliance must not be installed in areas where
ambient temperatures frequently exceed 42 °C or
areas where temperatures frequently drop below 6 °C.
9.3 Positioning
» Position the appliance in the installation location.
Note:
Ensure that the casing panel in the lower area of the
appliance is not damaged during positioning.
» Remove packing straps and polystyrene mouldings.
» Level the appliance by adjusting the equipment feet.
26�03�01�1127
26�03�01�1126
Air Air
Dimensions in mm
9.4 External installation
The location where the appliance is to be installed must meet the
following conditions:
— Load-bearing floor (wet weight of the appliance approximately
430kg).
— Never operate the appliance in rooms at a risk from explosion
due to dust, gases or vapours.
9.5 Internal installation
The room where the appliance is to be installed must meet the
following conditions:
— Load-bearing floor (wet weight of the appliance approximately
430kg).
— Never operate the appliance in rooms at a risk from explosion
due to dust, gases or vapours.
— Include in your considerations the utilisation of waste heat, for
example from a boiler, tumble drier or refrigerator/freezer.
— The available floor area in the installation room must be at
least 6m². Never install this appliance in rooms with a volume
of less than 13m³.
— Never restrict the ambience of the appliance through walls
and ceilings further than illustrated in Fig. „Positioning“.
— The room temperature limit is 6°C, as the ambient tempera-
ture will be reduced by approximately 1-3°C through the heat
pump operation. The initial temperature is reached again ap-
proximately ½ h after the heat pump has been switched OFF.
When installing the appliance in a boiler room, ensure that the
boiler operation will not be impaired.