EasyManua.ls Logo

STIEBEL ELTRON Accelera 300 - 10. Installation; CAUTION Injury; 10.1 Installation location; DANGER Explosion

STIEBEL ELTRON Accelera 300
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
WWW.STIEBEL-ELTRON-USA.COM ACCELERA® 300 HEAT PUMP WATER HEATER | 17
INSTALLATION
INSTALLATION
» Remove the packaging straps.
» Push the packaging foil far enough upwards that the pallet is
freely accessible.
» Remove the water heater carefully with the polystyrene
®
packaging from the pallet.
DANGER Injury from tipping over
The water heater has a high centre of gravity and a
low overturning moment. Ensure that the water heater
does not overturn when you remove it from its pallet.
» Slide the packaging foil far enough upwards to be able to
remove the first polystyrene
®
profiles from the sides. These
polystyrene
®
profiles on the sides are used as installation
aids in the following steps.
26_03_01_1395
» Separate the lower packaging section at the dividing line.
For this, make an incision of approx. 30 mm (1.25") into both
sides of the dividing line.
26_03_01_1396
» Slightly tilt the water heater.
DANGER Injury from overturning
Secure the water heater against overturning by
getting a second person to support the water heater.
» Push a wooden support underneath the lower part of the
packaging.
» Break out the free semi-shell of the lower section of the
packaging.
» Keep the water heaters slightly tilted.
» Wind out the free leveling foot, but not by more than 30mm
(1.25").
» Turn the locking nut on the thread of the leveling foot
towards the bottom cover. When the locking nut is tight
against the bottom cover, it stabilizes the leveling foot.
26_03_01_1384

Table of Contents

Other manuals for STIEBEL ELTRON Accelera 300

Related product manuals