3. Flow Switch Checking
Definition: Flow switch (Reed SW.) is a vacuum tube with two thin metallic strips at open circuit
(NO) configuration while on standby. It activates or goes on close circuit by use of a magnet.
3.1) Set unit at vertical direction
Simulate like a unit standby Flow Switch (Reed SW.) still open circuit (as no water supply).
- Set Multi )))) " and unplug the reed switch connector from the
Control PCB and check Reed Switch as in the pictures.
Check
Meter Result
Cause
Action
Pole - Pole
"Beep" signal or (~ 0 )
Reed SW. contact closed
Change new one*
No signal "OL" or ( 
Pass
No action
Remark: "OL" = Over Load for Digital Multimeter, " 
* Note: Recommend replacing magnet set at the same time.