EasyManua.ls Logo

STIEBEL ELTRON PHB 18 - 10 Installation; Standard Installation

STIEBEL ELTRON PHB 18
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Installation
ENGLISH
www.stiebel-eltron.com PHB | 7
10. Installation
10.1 Standard installation
- Electrical connection from above; installation on unfinished
walls
- Water connection on unfinished walls
For further installation options, see chapter "Alternative instal-
lation methods":
- Electrical connection from below on unfinished walls
- Electrical connection on finished walls
- Connecting a load shedding relay
- Water installation on finished walls
- Water connection on unfinished walls for appliance
replacement
Opening the appliance
D0000041615
Open the appliance by releasing the snap lock.
NT
T-
so
X1
26�02�02�0762
Remove the back panel by pressing the two locking tabs and
pulling the lower section of the back panel forwards.
Preparing the power cable
160
≥ 30
26�02�02�0887
Fitting the wall mounting bracket
26�02�02�0972
Mark out the holes for drilling using the installation tem-
plate. If the appliance is to be installed with water connec-
tions on finished walls, also mark out the fixing holes in the
lower part of the template.
Drill the holes and secure the wall mounting bracket with
2screws and 2rawl plugs (screws and rawl plugs are not
part of the standard delivery).
Fit the threaded stud provided.
Fit the wall mounting bracket.
Fitting the cable grommet
26�02�02�0950
Fit the cable grommet. For connecting cables >6mm², en-
large the hole in the cable grommet.

Table of Contents

Related product manuals