EasyManua.ls Logo

Stihl BT 121 - Fitting the Auger; Starting; Stopping the Engine; Starting Procedures

Stihl BT 121
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13BT 121
English / USA
Fuel mix ages
Only mix sufficient fuel for a few days
work, not to exceed 3 months of storage.
Store in approved fuel-canisters only.
When mixing, pour oil into the canister
first, and then add gasoline. Close the
canister and shake it vigorously by hand
to ensure proper mixing of the oil with
the fuel.
Dispose of empty mixing-oil canisters
only at authorized disposal locations.
Before fueling, clean the filler cap and
the area around it to ensure that no dirt
falls into the tank.
Always thoroughly shake the mixture in
the can before fueling your machine.
In order to reduce the risk of burns
or other personal injury from
escaping gas vapor and fumes,
remove the fuel filler cap carefully
so as to allow any pressure build-up
in the tank to release slowly..
After fueling, tighten down the filler
cap by hand as securely as
possible.
Change the fuel pickup body every
year.
Before storing your machine for a long
period, drain and clean the fuel tank.
Run the engine until the carburetor is
dry.
Gaso-
line
Oil (STIHL 50:1 or
equivalent high-quality oils)
US gal. US fl.oz
12.6
2 1/2 6.4
5 12.8
Fueling
427BA003 KN
427BA004 KN

Other manuals for Stihl BT 121

Related product manuals