EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 419

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Strasbaugh Installation
Version 4.0 - February 1998; Update 11/06/01 2 - 23 U
The items shown in Table 2-3 are also listed in the Calibration Report section of
the Strasbaugh, Installation Report.
For information on the procedures listed in Table 2-2, refer to the Software
Calibration chapter of the 6DS-SP Maintenance manual and the Calibration
Variables Listing, found in the Appendices of the same manual.
Table 2-3 Calibration Report Items
Calibration Items
Cooling Water Flow
Cooling Water Temperature In
Cooling Water Temperature Out
Left/Right Spindle Force
Left/Right Spindle Speed
Pad Conditioning Arm Speed
Pad Conditioning Downforce
Second Table Speed (if installed)
Slurry 1, Slurry 2 pH
Slurry 1, Slurry 2, Pump 3 (if installed) Flow
Table Speed
Table Temperature

Related product manuals