EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 504

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Model 6DS-SP Planarizer
8 - 14 Version 4.0 - February 1998
180-DAY PREVENTIVE
MAINTENANCE SCHEDULE
SUBJECT ACTION
Bridge
Clean Dry Air (CDA) or Nitrogen
Conditioning Device Rotation Gearbox
Oil
Coolant Flow Transmitter
D. I. Water
Elevators
Leak Detect Sensors
Polish Table Gearbox Oil
Resistive Thermal Device (aka.
Thermocouple in previous
documentation)
Robot
Slurry System
Check and calibrate bridge position.
Inspect and replace drive belt if needed.
Check flow rate.
Check oil level and fill if required. (Use 9
ozs. AGMA No. 8 or equivalent.)
Check and calibrate. (Refer to Signet
manufacturers data.)
Check flow rate.
Check drive belts and replace as needed.
Check and adjust.
Change. (Use 19 pts. AGMA No. 8 or
equivalent.)
Check and calibrate.
Check drive belts; replace as needed.
Check and adjust robot vacuum sensor.
Check and adjust slurry low sensors.
Check and calibrate peristaltic pumps.
Replace peristaltic pump tubes.

Related product manuals