EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 521

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Strasbaugh Mechanical Maintenance Procedures
Version 4.0 - February 1998 9 - 13
CHANGING WAFER BACKING
INSERTS
Note: The procedure below is intended for three-, four-, five-, six-, and
eight-inch wafer carriers.
PROCEDURE
Turn machine power ON and perform home sequence:
1. Following procedures detailed in the Operator Functions chapter of the
6DS-SP Operations manual, power up the machine and perform the
home sequence routine.
Remove carriers from spindles:
2. Following procedures detailed in the Operator Functions chapter of the
6DS-SP Operations manual, remove the carriers from spindles.
3. Place carriers on a work bench bottom side up.
Remove insert and clean carrier:
4. Raise one edge of insert.
5. Peel the insert off by rolling to the opposite edge.
6. Discard the used insert.
7. Clean the carrier and dry with a soft cloth:
a. Feel the carrier by hand for adhesive residue.
b. Remove remaining residue with isopropyl alcohol.
c. Dry with soft cloth.

Related product manuals