Maintenance Model 6DS-SP Planarizer
9 - 54 Version 4.0 - February 1998
C. ALIGNMENT PROCEDURE
1. Using a 9/16-in. socket wrench, loosen the four hex head bolts at the
base of the cleaning station by rotating each counterclockwise.
2. Tap on the side of the cleaning station with the largest gap, moving the
station in the direction that will lessen the gap.
3. Re-measure the gaps.
4. Tap and remeasure, repeating until the measurements meet the goal.
5. When the goal has been met, tighten the four bolts at the base of each
cleaning station by rotating them clockwise to firm.
6. Close the Left Side Operator Door.
7. Raise the left spindle:
7. At Page 2 of the Manual Control Menu, select Left Spindle Up/Down
and choose Up to raise the left spindle.
(right spindle = “Right Spindle Up/Down”)
8. At Page 1 of the Manual Control Menu, select Shuttle Move and choose
Front to move the shuttle assembly to its forward position.
RIGHT CLEANING STATION
Repeat as for left cleaning station, substituting right cleaning station and right
spindle where appropriate.