EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 593

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Strasbaugh Mechanical Maintenance Procedures
Version 4.0 - February 1998 9 - 85
LOAD STATIONS
CENTERING THE LOAD STATIONS
UNDER THE SPINDLES
A. BEFORE YOU BEGIN
Tools Required
none
Turn Machine Power On and Perform Home Sequence Routine
Follow the procedures detailed in the Operator Functions chapter of the 6DS-SP
Operations manual.
B. CENTER THE LOAD STATIONS UNDER THE SPINDLES
Note: Lowering the spindles and applying a small amount of down force
centers the load stations automatically.
1. Load carriers on the spindles:
Follow the procedures detailed in the Operator Functions chapter of
the 6DS-SP Operations manual.
2. At Page 1 of the Manual Control Menu, select Bridge Move and choose
Load to move the bridge to the load stations.

Related product manuals