Strasbaugh Software Calibration Procedures
Version 4.0 - February 1998 10 - 31
BRIDGE LOAD POSITION
CALIBRATION
Note:
Be sure to perform the Bridge Load Position Calibration procedures below
BEFORE beginning the Load Station and Cleaning Station alignment
procedures in the Mechanical Maintenance Procedures chapter of this manual.
CALIBRATION VARIABLE(S) SET DURING THIS PROCEDURE
2 Bridge load position
Nominal value: -35 in.
The distance in negative inches from the primary
table center to the home position.
A. BEFORE YOU BEGIN
Tools Required
• none
Turn Machine Power On and Perform Home Sequence Routine
Follow the procedures detailed in the Operator Functions chapter of the 6DS-SP
Operations manual.