EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 799

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Model 6DS-SP Planarizer
10 - 108 Version 4.0 - February 1998
ROBOT UP/DOWN LEFT LOAD POSITION
A. BEFORE YOU BEGIN
Tools Required
precision scale (accurate to .03125 in.)
test wafer
Turn Machine Power On, Perform Home Sequence Routine, and Install Carriers
on Spindles
Follow the procedures detailed in the Operator Functions chapter of the 6DS-SP
Operations manual.
B. CHECK CURRENT CALIBRATION
1. At Page 1 of the Manual Control Menu, select Bridge Move and choose
Pol Tbl 1 to move the bridge to polish position.
2. Select Robot Move and choose Left Load to move the robot to the left
load station.
3. Select Robot Up/Dn Move and choose Above Load to move the robot
Z-axis to its above load position.

Related product manuals