Strasbaugh Pneumatic Adjustments
Version 4.0 - February 1998 11 - 7
Up Flow Control
3. Rotate the up flow control fully clockwise.
4. Rotate the up flow control two full turns counterclockwise.
5. Close doors to the machine.
6. Test by repeating Section B., above.
a. If the motion does not meet the goal, correct by rotating the flow
control counterclockwise in 1/2-turn increments and retesting until
the goal is met.
b. When the goal is met, go on to the Down Flow Control, below.
Down Flow Control
7. Rotate the down flow control fully clockwise.
8. Rotate the down flow control one full turn counterclockwise.
9. Close doors to the machine.
10. Test by repeating Section B., above.
a. If the motion does not meet the goal, correct by rotating the flow
control counterclockwise in 1/4-turn increments and retesting until
the goal is met.
b. When the goal is met, go on to the Right Cleaning Station Device,
below.
Right Cleaning Station Device
Repeat as for the left cleaning station, making appropriate substitutions as shown
in the text above.