EasyManua.ls Logo

Strasbaugh 6DS-SP - Page 896

Strasbaugh 6DS-SP
1562 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Model 6DS-SP Planarizer
11 - 34 Version 4.0 - February 1998
2. Read the Left and Right Spindle Blow Off gauges located on the panel
inside the Left Front Service Door.
3. Unlock the red locking rings:
Pull out on the red locking rings surrounding the adjustment knobs.
4. Find the black button on the coil of Solenoid 11 on the valve panel.
Using a screwdriver, push up on the button to activate.
5. While pressing up on the Solenoid 11 button, set the Left Spindle Blow
Off adjustment knob to 5 to 10 LBS.
6. While pressing up on the Solenoid 11 button, set the Right Spindle
Blow Off adjustment knob to 5 to 10 LBS.
7. Release the coil button of Solenoid 11.
8. Push the red locking rings back in.
9. Replace the service door.

Related product manuals